← API reference
CANONICAL TYPE REFERENCE

PlannedOperationInput

One planned production step in a plan upsert/create. Positional: an edge refers to a step by its index in the plannedOperations list.

TypeID of the job operation (opr_…) this step realises. Rejected if it does not belong to the plan's job.

nameString!

Human-readable name of the step. Must not be blank.

Concrete kind of work performed, from the vertical's operation-kind catalog (e.g. printing, folding, binding).

TypeID of the capability (cpb_…) the work centre running this step must possess. Pins the step to a class of resources.

Estimated run time in minutes, excluding setup. Must be non-negative.

Make-ready time in minutes before the run. Defaults to 0 when omitted.

Explicit unit-bearing workload and expected good output; omit when unknown.

Units this step is planned to produce. Omit when the step's quantity is not planned; must be non-negative.

Ordering position within the plan. Defaults to the operation's index in this list when omitted.

View exact SDL
"""
One planned production step in a plan upsert/create. Positional: an edge refers to a step by its index in the plannedOperations list.
"""
input PlannedOperationInput {
  """
  TypeID of the job operation (`opr_…`) this step realises. Rejected if it does not belong to the plan's job.
  """
  operationId: OperationID!
  """Human-readable name of the step. Must not be blank."""
  name: String!
  """
  Concrete kind of work performed, from the vertical's operation-kind catalog (e.g. printing, folding, binding).
  """
  concreteKind: OperationKind!
  """
  TypeID of the capability (`cpb_…`) the work centre running this step must possess. Pins the step to a class of resources.
  """
  capabilityId: CapabilityID!
  """Estimated run time in minutes, excluding setup. Must be non-negative."""
  estimatedDurationMinutes: Int!
  """Make-ready time in minutes before the run. Defaults to 0 when omitted."""
  setupDurationMinutes: Int
  """
  Explicit unit-bearing workload and expected good output; omit when unknown.
  """
  quantities: PlannedOperationQuantitiesInput
  """
  Units this step is planned to produce. Omit when the step's quantity is not planned; must be non-negative.
  """
  productionQuantity: Int
  """
  Ordering position within the plan. Defaults to the operation's index in this list when omitted.
  """
  sortOrder: Int
}

One stable address across all schema views. Follow a field’s type to explore connections between domains.